Hoisting system for installing a wind turbine
Abstract
A hoisting system for the at least one of an installation, a decommissioning and a maintenance of a wind turbine which comprises at least a foundation, a tower, a yawing part and a rotor of at least 80 m diameter with at least one blade, comprising a first hoisting device which comprises measures to establish a load carrying joint with an already built part of the wind turbine which is located above the foundation, wherein the hoisting system is characterized in that the ratio between the maximum hoist load of the hoisting device and the mass of the heaviest part is larger than 0.2 and smaller than 1 and in particular smaller than 0.8 and more in particular smaller than 0.7 and preferably smaller than 0.6, with the heaviest part being a heaviest part which is hoisted as one piece and which belongs to the yawing part of wind turbine.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 23 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A hoisting system for at least one of an installation, a decommissioning, or a maintenance of a wind turbine, the wind turbine comprising a foundation, a tower, a yawing part, a rotor with a diameter of at least 80 meters, and at least one blade, the hoisting system comprising: a first hoisting device having a first hoisting cable; and a second hoisting device having a second hoisting cable, the second hoisting cable being a different cable from the first hoisting cable, wherein the second hoisting device is not supported on the already built part of the wind turbine, wherein the first hoistin
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗