Process for producing nitrobenzene
Abstract
The present invention relates to a process for the continuous production of nitrobenzene by the nitration of benzene with nitric acid and sulphuric acid under adiabatic conditions, not the entire production plant being shut down during a production stop, but the production plant being entirely or at least partly operated in recirculation mode. The invention further relates to a plant for producing nitrobenzene and to a method for operating a plant for producing nitrobenzene.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 35 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A plant configured, when in operation, to prepare nitrobenzene by nitration of benzene in the presence of sulfuric acid, the plant comprising the following plant sections: (I) a reactor for nitration of benzene with a mixture of nitric acid and sulfuric acid to form nitrobenzene, (II) a phase separation apparatus for phase separation of the reaction mixture obtained in the reactor (I) into an aqueous sulfuric acid-containing phase and an organic nitrobenzene-containing phase, (III) an evaporator (III.a) for concentration of the aqueous sulfuric acid-containing phase and a sulfuric acid reservo
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (35)
Non-Patent Literature (5)
- Aylett et al., “Generating Operating Procedures for Chemical Process Plants”, Integrated Manufacturing Systems Management, Dec. 1998, pp. 1-32.
- Bender, W. H., “Abstracts of 1960 Annual General Meeting Papers”, The Engineering Journal, Mar. 1960, pp. 100-102.
- Bijvank, M., “Shutdown Scheduling”, Business Mathematics and Informatics, Jul. 2004.
- Downs et al., A Plant-Wide Industrial Process Control Problem, Computers chem. Engng., vol. 17, No. 3, pp. 245-255, 1993.
- Fusillo et al., “Operating Procedure Synthesis: A Tutorial”, Carnegie Mellon University Engineering Design Research Center, 1987.