Thru-tubing retrievable intelligent completion system
Abstract
Provided are systems and methods for thru-tubing completion including a sub-surface completion unit (SCU) system including a SCU wireless transceiver for communicating with a surface control system of a well by way of wireless communication with a down-hole wireless transceiver disposed in a wellbore of the well, one or more SCU anchoring seals having an un-deployed position (enabling the SCU to pass through production tubing disposed in the wellbore of the well) and a deployed position (to seal against a wall of the target zone of the open-hole portion of the wellbore to provide zonal isolation between adjacent regions in the wellbore) and one or more SCU centralizers having an un-deployed position (enabling the SCU to pass through the production tubing disposed in the wellbore of the well) and a deployed position (to position the SCU in the target zone of the open-hole portion of the wellbore).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A thru-tubing completion system comprising: a sub-surface completion unit (SCU) configured to pass through production tubing disposed in a wellbore of a well and to be disposed in a target zone of an open-holed portion of the wellbore and perform completion operations in the target zone, the SCU comprising: a SCU wireless transceiver; one or more SCU anchoring seals configured to be positioned in an un-deployed position and a deployed position, the un-deployed position of the one or more SCU anchoring seals enabling the SCU to pass through the production tubing disposed in the wellbore of the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Bosworth, Steve et al.; “Key Issues in Multilateral Technology” Oilfield Review, Winter 1998; pp. 14-28.
- Bybee, Karen. “Through-Tubing Completions Maximize Production.” Journal of petroleum technology 58.02 (2006); pp. 57-58.
- Co-Pending U.S. Appl. No. 15/823,854, filed Nov. 28, 2017.
- Co-Pending U.S. Appl. No. 15/823,858, filed Nov. 28, 2017.
- Co-Pending U.S. Appl. No. 15/823,862, filed Nov. 28, 2017.