Filling mining method for fully-mechanized top coal caving working face

2Forward Citations (#44555818 Global)
0.4/yrCitation Velocity (#20630087 Global)
0.90Citation PageRank (#47621925 Global)
11Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Provided is a filling mining method for a fully-mechanized top coal caving working face, which relates to the field of mining engineering technologies. The method solves the technical problems of roof control of the fully-mechanized top coal caving working face and a large ground deformation of top coal caving mining. The method includes the following steps: at step A, dividing the fully-mechanized top coal caving working face into a filling zone and a top coal caving zone along a strike of the working face, or dividing the working face into a filling zone and a top coal caving zone along a strike and an inclination of the working face; at step B, determining a cycle interval of the working face; at step C, performing supporting for the filling zone before the working face, and completing coal caving in the top coal caving zone and performing round wood supporting in the filling zone; at step D, after the filling zone reaches the filling interval, disposing a filling tarpaulin behind a hydraulic support and pumping the filling paste; at step E, repeating steps C and D to complete mining. A mining method of alternate coal caving and filling is provided to complete the filling mining

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 2.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A filling mining method for a fully-mechanized top coal caving working face, comprising the following steps: at step A, dividing the fully-mechanized top coal caving working face into a filling zone and a top coal caving zone along a strike of the working face, wherein lengths of the filling zone and the top coal caving zone are equal to a strike length of the working face, a sum of widths of the filling zone and the top coal caving zone is equal to a width of the working face, and the filling zone is adjacent to the top coal caving zone; at step B, determining a cycle interval of the working

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (4)

  • Chinese Search Report issued in corresponding Chinese Patent Application No. 201811357304.8, dated Apr. 20, 2019.
  • First Office Action issued in corresponding Chinese Patent Application No. 201811357304.8, dated Apr. 28, 2019.
  • International Search Report issued in corresponding International Application No. PCT/CN2018/123655, dated May 27, 2019, State Intellectual Property Office of the P.R. China, Beijing, China.
  • Written Opinion issued in corresponding International Application No. PCT/CN2018/123655, dated May 27, 2019, State Intellectual Property Office of the P.R. China, Beijing, China.