Simultaneous injection and fracturing interference testing
Abstract
Fluids are pumped into the wellbore by pulsing the fluids at a variable, positive pressure relative to the geologic formation until a first pressure threshold in the first fracture zone is satisfied. The pumping results in a first pressure profile in the first fracture zone representing pressures in the first fracture zone over time responsive to the pumping, and a second pressure profile in the second zone representing pressures in the second zone over time responsive to the pumping. In response to determining that the first pressure threshold is satisfied, the fluids are ceased to pump into the wellbore for a duration of time. After the duration of time, the fluids are re-pumped into the wellbore by pulsing the fluids at the variable, positive pressure relative to the geologic formation until a second pressure threshold in the first fracture zone in the first fracture zone is satisfied.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 37 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: in a wellbore formed into a geologic formation comprising a first fracture zone and a second zone, the second zone outside the first fracture zone, the wellbore passing through both the first fracture zone and the second zone: pumping fluids into the first fracture zone by pulsing the fluids at a variable, positive pressure relative to the geologic formation until a first pressure threshold in the first fracture zone is satisfied, wherein the pumping results in a first pressure profile in the first fracture zone representing pressures in the first fracture zone over time r
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (37)
Non-Patent Literature (4)
- Gasda et al., “Wellbore Permeability Estimates from Vertical Interference Testing of Existing Wells,” Energy Procedia, vol. 37, Jan. 1, 2013, 8 pages.
- Gulf Cooperation Council Examination Report issued in GCC Application No. 2018-35517 dated Dec. 12, 2019, 4 pages.
- International Search Report and Written Opinion issued in International Application No. PCT/US2018/038079 dated Sep. 5, 2018, 16 pages.
- Kuchuk et al., “The use of Vertical Interference Testing to improve reservoir interference testing to improve reservoir characterization,” SPE, Oct. 18, 2000, 13 pages.