Task resource scheduling method and apparatus
Abstract
A task resource scheduling method and apparatus, through determining priority levels of multiple tasks as well as set task deadline times, and determining a preset resource upper bound, based on task priority levels schedules the successive order of executing multiple tasks, and post-scheduling tasks satisfy a first condition, wherein, the first condition is that a time resource conflict does not exist for the tasks, the time resource conflict being that a section exists on a time series where more than one task overlaps, and the sum of the resources occupied in the section having the overlap is greater than the resource upper bound. When multiple tasks are executed according to the present example embodiment, the existing first-arriving, first-compute rule is no longer utilized, but rather scheduling is performed based on the priority levels of tasks.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: determining priority levels and set task deadline times of multiple tasks; determining a preset resource upper bound; scheduling, based on task priority levels, a successive order of executing multiple tasks, post-scheduling tasks satisfying a first condition, the first condition being that a time resource conflict does not exist for the tasks, a time resource conflict being that a section exists on a time series where more than one task overlaps, and a sum of the resources occupied in the section having the overlap is greater than the resource upper bound; wherein schedul
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (21)
Non-Patent Literature (5)
- Bellavista, Paolo, et al. "Priority-based resource scheduling in distributed stream processing systems for big data applications." 2014 IEEE/ACM 7th International Conference on Utility and Cloud Computing. IEEE, 2014.pp. 363-370 (Year: 2014).
- Cao, Qi, Zhi-Bo Wei, and Wen-Mao Gong. "An optimized algorithm for task scheduling based on activity based costing in cloud computing." 2009 3rd International Conference on Bioinformatics and Biomedical Engineering. IEEE, 2009.pp. 1-3 (Year: 2009).
- Dong, Fang, et al. "A grid task scheduling algorithm based on QoS priority grouping." 2006 Fifth International Conference on Grid and Cooperative Computing (GCC'06). IEEE, 2006.pp. 1-4 (Year: 2006).
- Extended European Search Report dated Oct. 30, 2019, for European Patent Application No. 17773135.3, 9 pages.
- Selvarani, S., and G. Sudha Sadhasivam. "Improved cost-based algorithm for task scheduling in cloud computing." 2010 IEEE International Conference on Computational Intelligence and Computing Research. IEEE, 2010.pp. 1-5 (Year: 2010).