Flotation arrangement
Abstract
A flotation arrangement for treating mineral ore particles suspended in slurry includes a primary flotation line with a rougher part and a scavenger part. Overflow of at least one rougher primary flotation cell is arranged to flow directly into a rougher cleaner cell. Underflow from a first rougher cleaner flotation cell is combined into overflow from a rougher primary flotation cell downstream from the rougher primary flotation cell from which the first rougher cleaner flotation cell receives primary overflow; or into combined overflows from rougher primary flotation cells downstream from the rougher primary flotation cell from which the first rougher cleaner flotation cell receives primary overflow; or into overflow from an additional rougher cleaner cell which receives primary overflow from at least one rougher primary flotation cell downstream from the rougher primary flotation cell from which the first rougher cleaner flotation cell receives primary overflow.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A flotation arrangement for treating mineral ore particles suspended in slurry, comprising flotation cells for the separation of slurry into underflow and overflow wherein the separation is performed with the help of flotation gas, and wherein the arrangement comprises a primary flotation line, wherein underflow of each preceding flotation cell of the primary flotation line is directed to a subsequent flotation cell of the primary flotation line as infeed until a last flotation cell of the primary flotation line, the primary flotation line comprising: a rougher part with at least two rougher p
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (29)
Non-Patent Literature (5)
- Chinese Office Action dated Nov. 25, 2020, issued in corresponding Chinese Appln. No. 201910114023.8, 7 pages.
- Chinese Office Action dated Nov. 25, 2020, issued in related Chinese Appln. No. 201910114279.9, 6 pages.
- Extended European Search Report issued by the European Patent Office in relation to European Application No. 18753731.1 dated Nov. 25, 2020 (7 pages).
- Extended European Search Report issued by the European Patent Office in relation to European Application No. 18753952.3 dated Nov. 25, 2020 (8 pages).
- Flotación de Sulfuros de Cobre (https://www.911metallurgist.com/metalurgia/flotacion-de-sulfuros-de . . . 2) dated Oct. 23, 2016 (10 pages) along with English translation (1 page).