Abstract
A rig system includes a first base box and a second base box extending parallel to and offset from the first base box, such that an open space is defined therebetween. A rig floor is connected to the first and second base boxes and spans the open space. A mast is coupled to the rig floor. A rig-raising system is configured to raise the rig floor vertically above the ground. A combined local equipment room (LER) and drilling control room (DCR) skid is connected to the rig floor and configured to be raised with the rig floor. A reel skid is positioned at least partially vertically below the LER/DCR skid. A setback structure extends between the first and second base boxes and blocks the open space on at least one end.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for assembling a drilling rig, comprising: positioning a first base box of a substructure and a second base box of the substructure, such that the first and second base boxes are separated apart from one another by an open space; connecting a rig floor between the first and second base boxes; connecting a mast section to the rig floor; after connecting the mast section to the rig floor, connecting a setback structure between the first and second base boxes and, after connecting the setback structure, lowering the mast section such that the mast section extends in a horizontal directio
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.