Simulation device and method for integrated evaluation experiment for sand control wellbore plugging and plugging removal
Abstract
A simulation device for integrated evaluation experiment for sand control wellbore plugging and plugging removal, including a wellbore system, a whole sand control well plugging system, a local sand control well plugging system and a plugging removal system. The wellbore system simulates downhole working conditions of the sand control wellbore. Perforations of the whole sand control well plugging system and sand-filled pipe of the local sand control well plugging system are applied on the casing pipe of the wellbore system. The plugging process of the sand control well system is simulated by pumping a sand-laden slurry into the wellbore system. The plugging removal process is simulated by setting the plugging removal tool of plugging removal system through an oil tube in the wellbore system. The plugging removal effect of the plugging removal tool is analyzed and evaluated according to the reliable data measured by the pressure gauge, flowmeter, etc.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A simulation device for integrated evaluation experiment for sand control wellbore plugging and plugging removal, comprising: a wellbore system, a whole sand control well plugging system, a local sand control well plugging system, and a plugging removal system; wherein the wellbore system comprises a casing pipe and a sand screen pipe which are fixed on a support frame; the sand screen pipe located in the casing pipe and the casing pipe are coaxially arranged; a gravel packing section is formed between the casing pipe and the sand screen pipe; and a top cover at a top of the sand screen pipe i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (11)
Non-Patent Literature (2)
- Changyin, D. et al., "Experimental and Visual Simulation of Gravel Packing in Horizontal and Highly Deviated Wells," SPE-169237-MS, (2014) (Year: 2014).
- Suman, George O., Jr. et al., "Sand Control Design Criteria and Gravel Packing Concepts," SPE 10031 pp. 123-132 (1982) (Year: 1982).