Patents
US 10,620,281 B2#43382800 Most CitedActiveUnited States (USPTO)Utility

Systems and methods for handling peak power requirements of a medical imaging device

2Forward Citations (#43382800 Global)
0.3/yrCitation Velocity (#23984501 Global)
0.93Citation PageRank (#45896462 Global)
8Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method of handling a peak power requirement of a medical imaging device 106 is presented. The method includes determining, using at least one controlling unit 107, 108 , a first voltage corresponding to a direct current (DC) link 116 , a second voltage corresponding to one or more energy storage devices 110 , or a combination thereof, where a power source 102 is coupled to a plurality of loads via the DC link, and the energy storage devices are coupled to the DC link. Further, the method includes comparing, using the at least one controlling unit, the first voltage with a first reference value and the second voltage with a second reference value and regulating, using at least one controlling unit, at least one of the first voltage and the second voltage based on the comparison, to handle the peak power requirement of the medical imaging device.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 2.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of handling a peak power requirement of a medical imaging device, the method comprising: measuring, using at least one controlling unit, a first voltage corresponding to a direct current link, a second voltage corresponding to one or more energy storage devices, or a combination thereof, wherein a power source is operatively coupled to a plurality of loads via the direct current link, and wherein the one or more energy storage devices are operatively coupled to the direct current link; comparing, using the at least one controlling unit, the first voltage with a first reference value a

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (3)

  • Chinese patent application 201710206205.9 Office Action dated May 5, 2019; 6 pages.
  • Ristic et al., "Supercapacitor Energy Storage for Magnetic Resonance Imaging Systems", IEEE Transactions on Industrial Electronics, vol. 61, No. 8, p. 4225, Aug. 2014.
  • Senjing et al., "Optimal control strategy of dual-active-bridge converter for battery energy storage system", China International Conference on Electricity Distribution (CICED), p. 1220, Sep. 2014.