Sub-problem optimization of supply chain planning problems
Abstract
A system and method is disclosed for optimizing supply chain planning problems associated with a supply chain network. The system includes a supply chain planner coupled with one or more supply chain entities. The supply chain planner determines a supply chain plan for managing the flow of one or more items through the supply chain network.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system comprising: a computer, comprising at least two processors and a memory, configured to: model a supply chain planning problem as a hierarchy of linear programming problems based, at least in part, on data describing a flow of one or more items through one or more supply chain entities, wherein each level of the hierarchy is associated with an objective function; split the supply chain planning problem into a master-problem and a sub-problem, wherein the master-problem and the sub-problem comprise constraints associated the one or more supply chain entities; decompose the sub-problem i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 11,972,373 B2 | Time-based decomposition for supply chain optimization problem | 2024 | 0 |
References Cited — Backward Prior Art (10)
Non-Patent Literature (1)
- Search Report for Taiwan Invention Patent Application No. 097108172, dated Oct. 21, 2013.