Manufacturing method of composite structures with curing tools arranged outside the vacuum bag
Abstract
A manufacturing method of structures formed co-bonding second structural components to a first structural component. The method comprises the following steps: a) preparing for each second structural component an ensemble wherein a preform of the second structural component, surrounded by a band of a suitable material to form a vacuum bag, is disposed between curing tools which are thus in contact with the bag and not with the preform; b) positioning the ensembles on the first structural component and forming the vacuum bag for the complete structure joining the bands and complementary pieces; c) applying to the resulting assembly an autoclave cycle.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for manufacturing a structure of composite material formed by a first structural component and a plurality of second structural components, joining the second structural components in an uncured state to the first structural component in a cured state by co-bonding, comprising the following steps: a) for each second structural component, placing a band of a suitable material to form a vacuum bag on two spaced apart curing tools, and fixing lateral ends of the bands to one of the two spaced apart curing tools, the bands being dimensioned so as to extend beyond all edges of the second s
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (17)
Non-Patent Literature (1)
- European Search Report, dated Oct. 26, 2015, priority document.