Method for managing production of hydrocarbons from a subterranean reservoir
Abstract
In a wellbore ( 1 ) provided with a non-cemented perforated liner ( 6 ) forming a continuous annular space ( 7 ) between the liner and the formation ( 2 ), the liner having an original perforation pattern being optimized for acid stimulation of the wellbore, the following steps are performed: injecting a hydrocarbon displacement fluid and measuring parameters relevant for inflow profiling, on the basis thereof, determining an actual inflow profile (P a ) over the length of the wellbore, comparing the determined actual inflow profile (P a ) with a preferred inflow profile (P p ) over the length of the wellbore, estimating, on the basis of the difference between the actual inflow profile (P a ) and the preferred inflow profile (P p ), a modified perforation pattern for the liner, determining how the original perforation pattern of the liner may be adapted to form said modified perforation pattern for the liner, and adapting the perforation pattern of the liner accordingly.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for managing production of hydrocarbons from a subterranean reservoir comprising at least one injector wellbore and at least one producer wellbore, each surrounded by a formation, each wellbore having a horizontal section including a heel section and a toe section, the horizontal section being provided with a non-cemented perforated liner, thereby forming a continuous at least substantially annular space between the non-cemented perforated liner and the formation, the liner having an original perforation pattern for acid stimulation of the wellbore so that the total hole area per leng
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (21)
Non-Patent Literature (4)
- International Search Report and Written Opinion for PCT/EP2015/054344, dated Jul. 8, 2015.
- Preliminary Report on Patentability for PCT/EP2015/054344, dated Sep. 6, 2016.
- Search report for Danish Application No. PA 2016 70780, Completed Aug. 4, 2017.
- Search report for Great Britain Application No. GB1403676.8, dated Sep. 3, 2014.