hottubpatentshottub.tech
US 10,243,708 B2#114936 Most CitedActiveUnited States (USPTO)Utility

Method for performing dynamic downlink configuration in wireless communication system, base station and terminal

0Forward Citations (#114936 Global)
0.0/yrCitation Velocity (#114936 Global)
0.98Citation PageRank (#114936 Global)
11Prior Art Cited
9Structured Claims
0Drawings / Sheets

Abstract

A method performing dynamic downlink configuration in a wireless communications system, a base station, and a terminal. The method includes: setting a reconfiguration point to enable a first uplink and downlink subframe configuration to be adopted in a first configuration period before the reconfiguration point and enable a second uplink and downlink subframe configuration to be adopted in a second configuration period after the reconfiguration point; and adopting a reference uplink/downlink subframe configuration adapted for an uplink subframe intersection of respective uplink/downlink subframe configurations for a time sequence of a downlink HARQ process during the predetermined change of the dynamical downlink configuration. The resource utilization rate during the TDD uplink and downlink configuration and reconfiguration can be effectively ensured, the time sequence conflict can be solved, the process can be coordinated, the user throughput can be ensured, and the transmission delay can be reduced as far as possible.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 0.

Claims (9)

  1. Claim 1Independent Claim

    A method for performing at a base station a dynamical downlink configuration in a wireless communication system, comprising: setting a reconfiguration point with a processor at the base station, so that a first uplink/downlink subframe configuration is adopted in a first configuration period before the reconfiguration point and a second uplink/downlink subframe configuration is adopted in a second configuration period after the reconfiguration point; and adopting, during a predetermined change of the dynamical downlink configuration, for a time sequence of a downlink HARQ process, a reference uplink/downlink subframe configuration for an uplink subframe that is an intersection of respective uplink/downlink subframe configurations, wherein the reference uplink/downlink subframe configuration is determined by a maximum uplink and a maximum downlink subframe intersection between the first uplink/downlink subframe configuration and the second uplink/downlink subframe configuration.

  2. Claim 2Depends on #1

    The method according to claim 1 , wherein a boundary frame in which uplink/downlink subframe configuration is changed is included during the predetermined change of the dynamical downlink configuration.

  3. Claim 3Depends on #1

    The method according to claim 1 , wherein the reference uplink/downlink subframe configuration includes configuration # 4 , configuration # 2 and configuration # 5 .

  4. Claim 4Depends on #1

    The method according to claim 1 , wherein a downlink HARQ process transmitted in the first configuration period which is to be retransmitted after the reconfiguration point continues to be transmitted in the second configuration period, in the case that the maximum number of the first downlink HARQ processes in the first configuration period is less than the maximum number of the second downlink HARQ processes in the second configuration period.

  5. Claim 5Depends on #1

    The method according to claim 1 , wherein in the case that the maximum number of the first downlink HARQ processes in the first configuration period is greater than the maximum number of the second downlink HARQ processes in the second configuration period, the method further comprises: setting a starting point-in-time for scheduling control in the first configuration period before the reconfiguration point, to perform scheduling control on the downlink HARQ process during a time period between the starting point-in-time for scheduling control and the reconfiguration point.

  6. Claim 6Depends on #5

    The method according to claim 5 , wherein the time period between the starting point-in-time for scheduling control and the reconfiguration point is not less than three times of a maximum RTT time.

  7. Claim 7Depends on #5

    The method according to claim 5 , further comprising: scheduling, during the time period between the starting point-in-time for scheduling control and the reconfiguration point, new data to transmit the downlink HARQ process, in the case that the number of downlink HARQ processes which are to be fed back or retransmitted is less than the maximum number of the second downlink HARQ processes, wherein a sum of the number of the downlink HARQ processes which are to be fed back or retransmitted and the number of transmitted downlink HARQ processes is equal to the maximum number of the second downlink HARQ processes; and arranging, in the last transmission period before the reconfiguration point, process numbers of the downlink HARQ processes in an ascending order, to map the process numbers to process numbers in the second configuration period.

  8. Claim 8Depends on #7

    The method according to claim 7 , wherein in the second configuration period, the mapped process numbers are used for informing in feeding back or retransmitting the downlink HARQ processes of the first configuration period.

  9. Claim 9Depends on #5

    The method according to claim 5 , wherein during the time period between the star

Technical Overview & Description

FIELD The disclosure relates to the technical field of wireless communication, and in particular to a method for performing a dynamic downlink configuration in a wireless communication system, a base station and a communication terminal. BACKGROUND This section provides background information relating to the present disclosure, which is not necessarily prior art. In a time division duplex (TDD) wireless communication system supported by the long term evolution (LTE) technology, 7 types of different non-symmetric uplink/downlink configurations can be provided. These uplink/downlink configurations may be provided downlink subframes of 40% to 90%, and have flexible service adaptability. For the 7 types of uplink/downlink configurations, it is stipulated in the current standard the uplink/downlink hybrid automatic repeat request (HARQ) time sequence and uplink/downlink HARQ parallel process numbers for different configurations. In which, the uplink HARQ time sequence includes a schedule UL grant time sequence for the physical uplink shared channel (PUSCH) and a feedback PHICH (physical hybrid ARQ indicator channel) time sequence for the PUSCH, and the downlink HARQ time sequence includes feedback ACK/NACK time sequence for the physical downlink shared channel (PDSCH). In the current TDD wireless communication system, in order to reduce interference between cells and decrease the management complexity, the same uplink/downlink configuration will be set statically for cells in the whole network. Under a homogeneous network, in case of covering using a macro base station, since the macro base station provides service for many users and the statistic law for the covered regions is smooth and consistent, the method of statically setting the same uplink/downlink configuration for the cells in the whole network is appropriate. However, under a heterogeneous network, a lot of low power access points are introduced, for example micro base stat

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (11)

PatentTitleYearCitations

Non-Patent Literature (4)

  • Discussion on HARQ and UL-grant timing with dynamic TDD UL-DL configuration, 3GPP TSG RAN WG1 Meeting #68bis, R1-121260, Mar. 26-30, 2012, 6 pages.
  • International Search Report dated Feb. 27, 2014 in PCT/CN13/090517 Filed Dec. 26, 2013.
  • PDSCH HARQ timing for more than 2 cell cases, 3GPP TSG RAN WG1 #70, R1-123451, Aug. 13-17, 2012, 4 pages.
  • PDSCH HARQ timing, 3GPP TSG RAN WG1 #68bis, R1-121612, Mar. 26-30, 2012, 4 pages.