US 10,240,862 B2#27211877 Most CitedActiveUnited States (USPTO)Utility

LNG production plant and corresponding method of construction

4Forward Citations (#27211877 Global)
0.6/yrCitation Velocity (#14142542 Global)
1.08Citation PageRank (#37671593 Global)
19Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

An LNG production plant and a method of constructing the LNG production plant is disclosed. The LNG production plant includes at least one plant module and a support structure to support the plant module. Each plant module is dry transported by a heavy lift vessel and subsequently transferred to the support structure without lifting the plant module from a deck of the vessel. The support structure includes a landing substructure onto which the plant module is transferred from the vessel. Landing substructure may be onshore or offshore. The support structure may also include one or more onshore support substructures and a transfer path enabling a plant module to be moved from the landing substructure to a corresponding onshore support substructure.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 4.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of constructing a LNG production plant comprising the steps of: dry transporting on a heavy lift vessel a plant module across a body of water; transferring from the heavy lift vessel the plant module onto a structure arranged to support the plant module at a fixed altitude, wherein the structure is at least partially located onshore and leads to or constitutes an onshore support substructure for supporting the plant module and wherein the transferring is performed without lifting the module; and arranging the plant module as, or as a part of, the LNG production plant to facilitate the

  2. Claim 2Depends on #1

    The method according to claim 1 , wherein the transferring comprises for at least a period of time supporting the plant module simultaneously on both the structure and a deck of the heavy lift vessel.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (19)

PatentTitleYearCitations
US 3,977,346 ADeck structure and method for building same197636
US 4,086,777 AApparatus for launching battered leg jackets for offshore platforms197831
GB 2,003,798 AFloating plant for offshore liquefaction temporary storage and loading of lng—14
US 4,188,157 AMarine structure198067
US 4,690,586 AMethod and apparatus for positioning an offshore platform jacket198731
US 4,729,695 AProcess for the installation of the enbloc superstructure of an offshore platform, and equipment for carrying it practically198833
US 4,930,938 AOffshore platform deck/jacket mating system and method199040
US 5,388,930 AMethod and apparatus for transporting and using a drilling apparatus or a crane apparatus from a single movable vessel199535
US 5,403,124 ASemisubmersible vessel for transporting and installing heavy deck sections offshore using quick drop ballast system199561
US 5,924,822 AMethod for deck installation on an offshore substructure199924
US 6,347,909 B1Method to transport and install a deck200224
CN 201,999,177 USuper-large barge for float-over installation201110
US 8,251,004 B2Device for transporting structures on water201214
US 2013071207 A1Quick release system for topsides float-over installation on offshore platforms—6
US 8,534,213 B2Skid shoe assembly for loading and transporting large structures20133
AU 2012207059 B2Linked LNG production facility20135
US 8,899,880 B2Structure-assisted jackup system20143
WO 2015/039169 A1Expandable lng processing plant—9
CA 2,888,026 A1Expandable lng processing plant—1

Non-Patent Literature (4)

  • AU Patent Examination Report No. 1, dated Sep. 21, 2015, 5 pages.
  • CA Office Action, dated Apr. 13, 2017, 3 pages.
  • PCT International Preliminary Report, PCT/AU2016/000125, dated Mar. 27, 2017, 6 pages.
  • PCT International Search Report, PCT/AU2016/000125, dated Dec. 1, 2016, 3 pages.