Patents
US 10,240,675 B2#80009878 Most CitedActiveUnited States (USPTO)Utility

Fluid seal and method of sealing a gas containment system

0Forward Citations (#80009878 Global)
0.0/yrCitation Velocity (#80009878 Global)
0.56Citation PageRank (#80009878 Global)
16Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A fluid seal system for a hydrocarbon recovery capsule includes a plurality of interconnected fluid seals each comprising an elongated sealing member clamped to a bulkhead plate and biasing a geomembrane to the bulkhead plate. A compression plate is positioned between each elongated sealing member and the bulkhead plate, thereby clamping the geomembrane to the bulkhead plate. An enclosed channel of each elongated sealing member receives a slurry. Clay amended soil surrounds and compresses the plurality of interconnected seals to provide a fluid seal that is capable of withstanding high temperatures while sealing off fluid and gas from the environment. A method of sealing a hydrocarbon recovery capsule is disclosed and described.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 0.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A fluid seal for a material recovery capsule, the fluid seal comprising: an elongated sealing member attached to a bulkhead plate and biasing a geomembrane to the bulkhead plate; and an enclosed channel defined by the elongated sealing member and the bulkhead plate, the channel adapted to receive a slurry that provides a fluid tight seal for the material recovery capsule, wherein the elongated sealing member is a C-channel clamped to the bulkhead plate by a fastener extending through the channel.

  2. Claim 2Depends on #1

    The fluid seal of claim 1 , wherein the slurry comprises a sealing fluid, a swelling clay, and a cement.

  3. Claim 3Depends on #1

    The fluid seal of claim 1 , wherein the slurry comprises glycerin, water, bentonite, and a cement.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (16)

PatentTitleYearCitations
US 3,918,233 AConstruction system197548
US 4,370,003 ATemporary gas seal for gas level drift of an in situ oil shale retort19832
US 4,461,707 AUltrafiltration and reverse osmosis tubular membrane module198438
US 4,682,911 ASecondary containment systems especially well suited for hydrocarbon storage and delivery systems198731
US 4,697,954 ABasemented floor structure for a waste dump198715
US 5,580,185 AOil containment boom199630
US 5,806,252 AWaterproofing system for hydraulic structures with rigid sheets in synthetic material199835
DE 10,127,493 A1Renovation of a dam wall has a drainage layer fastened to the wall surface, at the water side, covered by a welded plastics sealing layer—10
US 6,612,779 B1Embankment dam and waterproofing method200346
US 6,619,879 B1Method and device for the waterproofing of joints and cracks in hydraulic works, concrete and masonry structures200327
EP 1,767,704 A1Device for stretching and/or anchoring of an impermeable plastic foil for a waterproof covering of a fixed wall such as a barrage and use of the said device—8
EP 2,322,722 A1Device for sealing an aperture in a sealing sheet assigned to a penetration device—3
WO 2011/057996 A1Device for sealing a penetration associated with a penetrating element in a sealing sheet—1
US 2011176876 A1Method and system for punctual fastening a waterproofing membrane to hydraulic works—14
US 8,291,668 B2Device for in-situ barrier201217
US 8,366,918 B2Vapor collection and barrier systems for encapsulated control infrastructures20134

Non-Patent Literature (4)

  • Benson et al., Test Section Installation Instructions Alternative Cover Assessment Program, Environmental Geotechnics Report No. 99-3, Dec. 17, 1999, Univ. of Wisconsin-Madison, Madison, Wisconsin.
  • Deyer et al., Engineering Evaluation Report-Harbor Point Development Exelon Tower, MRCE File No. 11896A-40, Aug. 8, 2013, Mueser Rutledge Consulting Engineers.
  • Deyer et al., Engineering Evaluation Report—Harbor Point Development Exelon Tower, MRCE File No. 11896A-40, Aug. 8, 2013, Mueser Rutledge Consulting Engineers.
  • Ladd et al., Laboratory Studies for Determining Flexible-Membrane Soil Bedding Requirements, EPA, Sep. 1983, p. 128.