In-order message processing with message-dependency handling
Abstract
The disclosure generally describes computer-implemented methods, software, and systems for modeling and deploying decision services. One computer-implemented method includes operations for identifying a sequence number of a first message, the sequence number indicating a position of the first message within a first sequence of messages. If a second message positioned prior to the first message in the first sequence is in a final processing state and the second message in the first sequence is a parent message, a plurality of child messages associated with the second message are identified. Each child message is associated with a sequence number indicating a position of the child message within a second sequence associated with the plurality of child messages. The computer-implemented method determines whether a child message positioned at the end of the second sequence is in a final processing state.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer-implemented method, comprising: receiving, at a first processing node and from a queuing database, a first message; identifying a sequence number of the first message, the sequence number indicating a position of the first message within a first sequence of messages at the queuing database, the first sequence of messages comprising a serialized sequence of messages wherein messages positioned prior in the serialized sequence must be processed before messages positioned thereafter in the serialized sequence; and after receiving the first message and before processing the first messag
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (8)
Non-Patent Literature (3)
- Philip S. Yu et al "On Real-Time Databases: Concurrency Control and Scheduling" (Year: 1994).
- Subhash Bhalla "Executing Serializable Transactions within a Hard Real-time Database System" (Year: 1998).
- U.S. Appl. No. 13/534,504 filed Jun. 27, 2012, entitled "Configuring Integration Capabilities for System Integration", Inventor Daniel Ritter et al.