Carrier aggregation with dynamic TDD DL/UL subframe configuration
Abstract
A user equipment (UE) communicating in a carrier aggregation (CA) or multi-connectivity operation using more than one component carrier (CC), where at least one of the CCs is enabled to use evolved interference management for traffic adaptation (eIMTA), adapts the hybrid automatic repeat request (HARQ) timing of the UE communications based on changes in the eIMTA and configurations. The HARQ timing includes HARQ acknowledgement (ACK) timing or HARQ scheduling timing.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for wireless communication, comprising: receiving a configuration, comprising at least a first component carrier (CC) and a second CC, at least one of the first CC or the second CC being enabled for evolved interference management for traffic adaptation (eIMTA); determining hybrid automatic repeat request (HARQ) timing for at least one of the first CC or the second CC, the determined HARQ timing based at least in part on the received configuration and the at least one of the first CC or the second CC being enabled for eIMTA, the determined HARQ timing being further based on a cross-ca
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (12)
Non-Patent Literature (5)
- Alcatel-Lucent Shanghai Bell et al., "Scheduling and HARQ Timing for TDD-FDD Carrier Aggregation," 3GPP TSG RAN WG1 Meeting #75; San Francisco, USA, Nov. 11-15, 2013, 4 pgs., R1-135160, URL: http://www.3gpp.org/DynaReport/TDocExMtg--R1-75--30046.htm, 3rd Generation Partnership Project.
- Huawai et al., "Discussion on HARQ Operation Related Issues for TDD eiMTA," 3GPP TSG RAN WG1 Meeting #75, San Francisco, USA, Nov. 11-15, 2013, 4 pgs., R1-135014, URL: http://www.3gpp.org/DynaReport/TDocExMtg--R1-75-30046.htm, 3rd Generation Partnership Project.
- IPEA/EPO, Second Written Opinion of the International Preliminary Examining Authority, Int'l. App. No. PCT/US2015/013430, dated Jan. 7, 2016, European Patent Office, Rijswijk, NL, 5 pgs.
- ISA/EPO, International Search Report and Written Opinion of the International Searching Authority, Int'l App. No. PCT/US2015/013430, dated May 8, 2015, European Patent Office, Rijswijk, NL, 12 pgs.
- Samsung, "Remaining Issues on HARQ Timing for eiMTA," 3GPP TSG RAN WG1 #75, San Francisco, USA, Nov. 11-15, 2013, pp. 1-3; R1-135190, URL: http://www.3gpp.org/DynaReport/TDocExMtg--R1-75--30046.htm, 3rd Generation Partnership Project.