Scheduling failover for lighting controls
Abstract
A lighting control system of networks and devices designed to allow scheduled events to continue to operate in the case of partial or full network operation and failure. The lighting control system can rely on any network controller to act as a schedule master that evaluates a schedule of time-based lighting control events. When failure of the acting schedule master occurs or network communication therewith, the lighting control system changes the scheduling master to a different network controller based on a fail over protocol. The failover protocol includes detecting when an acting schedule master controller stops working by, for example, failing to receive a keep-alive message at a different network controller within a predetermined amount of time. Upon detecting failure of the schedule master controller, a network controller with a different controller identifier takes over as the schedule master in accordance with a controller identifier evaluation or protocol.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 31 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: connecting from a first network controller of a first plurality of network controllers to a network, wherein: connecting from the first network controller to the network includes designating the first network controller with a controller identifier that is unique to the first network controller and a network identifier that represents a logical collection of the first plurality of network controllers on the network, and the first plurality of network controllers control a respective luminaire directly or indirectly via a lighting control device; receiving, within a timeout
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (31)
Non-Patent Literature (3)
- Canadian Office Action for Canadian Application No. 2,975,110, dated Jun. 6, 2018, 3 pages.
- Dynamics Spaces Application Guide, Bringing Spaces to Life, 2016, 17 pages.
- Fresco User Guide Based on FW 103.18, dated Aug. 17, 2015, 27 pages.