Methods and apparatus to provision a workload in a virtual server rack deployment
Abstract
Methods and apparatus to provision a workload in a virtual server rack deployment are disclosed. An example method includes determining, via a first resource manager executing on a processor, parameters of a request for allocating resources of a virtual server rack for performing a workload, determining logical computing resources to be utilized for performing the workload based on the parameters, determining first physical computing resources installed in a first physical rack and second physical computing resources installed in a second physical rack included in the virtual server rack to perform the determined logical computing resources, and instructing a first centralized manager of virtual hosts to provision the first physical computing resources into the logical computing resources to allocate the logical computing resources for performing the workload.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 15.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method to provision workloads in cloud services implemented in virtual server racks, the method comprising: determining, via a first resource manager executing on a processor installed within a first physical rack, parameters including a number of virtual computing devices and a redundancy requirement of a request for allocating resources of a virtual server rack for performing a workload, the first resource manager to manage computing devices within the first physical rack that provide resources to a virtual server rack, the first resource manager elected, from among a plurality of resource
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 15 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Cisco, "Cisco UCS C-Series Servers Integrated Management Controller CLI Configuration Guide, Release 1.3," http://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/c/sw/cli/config/guide/131/b_Cisco_UCS_C-Series_CLI_Configuration_Guide_131.pdf, Mar. 11, 2011, 150 pages.
- Cisco, "Cisco UCS Faults and Error Messages Reference," http://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ts/faults/reference/ErrMess/UCS_SEMs.html, retrieved on Aug. 31, 2016, 125 pages.
- Cisco, "Cisco UCS Manager Troubleshooting Reference Guide," Chapter: Troubleshooting Server Hardware Issues, http://www.cisco.com/c/en/us/td/docs/unified_computing/ucs/ts/guide/UCSTroubleshooting/UCSTroubleshooting_chapter_0111.html, retrieved on Aug. 31, 2016, 20 pages.
- Cisco, "Proven Savings in IT Operations," http://www.cisco.com/c/en/us/products/servers-unified-computing/ucs-manager/index.html, retrieved on Aug. 31, 2016, 2 pages.
- Cisco, "Servers-Unified Computing," http://www.cisco.com/c/en/us/products/servers-unified-computing/index.html, retrieved on Aug. 31, 2016, 3 pages.