Patents
US 10,082,007 B2#17738281 Most CitedActiveUnited States (USPTO)Utility

Assembly for toe-to-heel gravel packing and reverse circulating excess slurry

6Forward Citations (#17738281 Global)
0.8/yrCitation Velocity (#10002075 Global)
1.62Citation PageRank (#20298702 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A treatment assembly treats zones of a horizontal borehole. For example, the assembly can gravel pack a zone by delivering slurry down a workstring. The slurry exits the workstring's outlet and pass to the borehole annulus of the zone through a flow port in the assembly. The gravel in the slurry can pack the borehole in an alpha-beta wave from toe to heel, and the fluid returns from the borehole flow through a screen back into the assembly. After gravel packing, operators remove excess slurry from the workstring by reverse circulating down the assembly to carry the excess slurry uphole through the workstring. Closures on the assembly prevent the reverse circulation from communicating through the screens to the borehole annulus. Additionally, flow valves can be used on the flow ports to selectively open and close them.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 6.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A formation treatment method for a borehole, the method comprising: isolating a borehole annulus of the borehole around an assembly into a plurality of isolated zones, the assembly in each isolated zone having a first port and a screen communicating a through-bore of the assembly with the borehole annulus, the first port having a first closure selectively operable between opened and closed conditions, the screen having a check valve permitting fluid communication from the screen to a second port of the through-bore and preventing fluid communication from the second port to the screen; position

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 3,134,439 AGravel packing apparatus196429
US 3,963,076 AMethod and apparatus for gravel packing well bores197678
US 4,105,069 AGravel pack liner assembly and selective opening sleeve positioner assembly for use therewith1978205
US 4,440,218 ASlurry up particulate placement tool198459
US 4,474,239 ASand placement198444
SU 1,191,563 A1Apparatus for producing a gravel filter19857
US 5,113,935 AGravel packing of wells1992248
WO 9,208,875 A2Well completion system—63
US 5,181,569 APressure operated valve199356
RU 1,810,500 CDevice for establishment of well gravel packed filter19936
US 5,269,375 AMethod of gravel packing a well199327
EP 0,588,421 A1Method and production pipe in an oil or gas reservoir—31
US 5,435,393 AProcedure and production pipe for production of oil or gas from an oil or gas reservoir1995180
AU 672,983 B2Procedure and production pipe for production of oil or gas from an oil or gas reservoir19962
US 5,803,179 AScreened well drainage pipe structure with sealed, variable length labyrinth inlet flow control apparatus1998193
US 5,934,376 AMethods and apparatus for completing wells in unconsolidated subterranean zones1999119
US 6,003,600 AMethods of completing wells in unconsolidated subterranean zones199980
US 6,253,851 B1Method of completing a well200138
US 6,371,210 B1Flow control apparatus for use in a wellbore2002197
US 6,446,722 B2Methods for completing wells in unconsolidated subterranean zones200246
US 6,464,006 B2Single trip, multiple zone isolation, well fracturing system2002121
US 2002157837 A1Flow control apparatus for use in a wellbore—89
US 2003000702 A1Apparatus and method for sequentially packing an interval of a wellbore—23
US 2003000701 A1Apparatus and method for progressively gravel packing an interval of a wellbore—18

Non-Patent Literature (5)

  • “7 Expandable Reservoir Completion,” by Scott Watters, Society of Petroleum Engineers, North China Int. Section Sand Control and COmpletion Strategy Workshop, May 2008, 16 pages.
  • “Cased-Hole Completion Services,” Weatherford (c) 2007, 12 pages.
  • “Expandable Completion Systems,” Weatherford, (c) 2005-2008, 12 pages.
  • “Inflow Control Devices: FloReg Deploy-Assist (DA) Device,” obtained from weatherford.com, (c) 2010, article No. 7429.00, 2 pages.
  • “Openhole Completion Systems,” Weatherford (c) 2009, article No. 6683.00, 52 pages.