Gas compression system for wellbore injection, and method for optimizing gas injection
Abstract
A gas compression optimization system and a method for optimizing gas injection rate in support of a gas lift operation. The optimization system is designed to control a rate of gas injection in connection with a gas lift system in a wellbore. The system includes a string of production tubing, and an annular region around the production tubing. The system also comprises a production line at the surface. The system further includes a pressure transducer that is configured to determine a differential pressure across an orifice plate placed along the production line. The system additionally includes a gas injection line. The gas injection line is at the surface, and is configured to inject a compressible fluid into the annular region. The system additionally includes a controller which is configured to control the injection of the compressible fluid into the annular region in response to differential pressure signals.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A gas compression optimization system for a wellbore, comprising: a tubing string placed in a wellbore, the tubing string extending from a surface down to a selected subsurface formation; an annular region residing around the tubing string, the annular region also extending down into the wellbore and to the subsurface formation; a production line at the surface and in fluid communication with the tubing string; an orifice plate at the surface and residing along the production line, the orifice plate having an opening that is sized relative to an inner diameter of the tubing string; a pressure
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (7 of 7 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Ali et al.; Investigation of New Tool to Unload Liquids from Stripper-Gas Wells; Society of Petroleum Engineers; 2003, SPE 84136, pp. 1-12.
- Armenta et al.; Operating Dual-Completed Well to Increase Gas Recovery in Low Productivity Gas Reservoirs with Water Production Problems; Petroleum Society, 2004; 2004-172; pp. 1-15.
- Bill Lane, The Case for Intelligent Artificial Lift; upstreampumping.com; 2016.
- Boswell et al.; Controlling Liquid Load-Up with "Continuous Gas Circulation"; Society of Petroleum Engineers; 1997, SPE 37426, pp. 325-332.
- Elmer et al.; New Single Well Standalone Gas Lift Process Facilitates Barnett Shale Fracture Treatment Flowback; Society of Petroleum Engineers; 2009, SPE 118876, pp. 1-8.