System and method for dynamically coordinating tasks, schedule planning, and workload management
Abstract
Systems and methods for dynamically coordinating a plurality of tasks are provided. Such tasks include a priority rank and at least one of a target date, a classification, an associated application, an associated action, and an associated priority rank adjustment parameter. A particular task can be processed relative to other tasks to generate a first scheduling scheme that defines a prioritized arrangement of the tasks. Based on the priority rank adjustment parameter(s), further scheduling schemes can be generated in lieu of the first scheduling scheme, thereby accounting for the respective priority rank adjustment parameters by influencing the arrangement of the tasks relative to one another. Additionally, based on a status notification, the tasks can be processed to generate a scheduling scheme that accounts for the status notification by influencing the arrangement of the first task and the stored tasks relative to one another.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for dynamically managing workload across one or more scheduling schemes using a computing device, the computing device having a hardware processor, a memory, and a coordination application stored in the memory and executable by the processor, the method comprising: processing a first scheduling scheme with a second scheduling scheme, each of the scheduling schemes corresponding to a respective user; based on the processing, identifying a workforce insufficiency across the processed scheduling schemes by, comparing the time inventory across the processed first scheduling scheme and the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (22)
Non-Patent Literature (2)
- Collins et al. "Automated assignment and scheduling of service personnel", 1994 IEEE, pp. 33-39.
- Keskin et al. "Exact response-time analysis for fixed-priority preemption-threshold scheduling", 2010 IEEE, 4 pages.