Project management system and method
Abstract
A project management system comprising a first, second, third, fourth and fifth processing sequences embodied in a computer readable medium. The first processing sequence is operable to provide a user interface to display a plurality of alert indicia corresponding to a plurality of alert status of a plurality of project requirements. The second processing sequence is operable to convert an incomplete requirement to a complete requirement upon completion of a task corresponding to the incomplete requirement. The third processing sequence is operable to determine the alert status of the requirements of the plurality of projects based on a time difference between a current date and a target date corresponding to each requirement. The fourth and fifth processing sequences are operable override the alert status based on user selections.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 40 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A project management system comprising: a non-transitory computer readable storage medium operable for storing a plurality of machine readable computer instructions operable to control one or more elements of an information processing system including a processor, a display, an input section, and an output section to generate outputs comprising: a first section of machine readable computer instructions adapted to operate said information processing system to receive a first plurality of data from said input section, associate, and store a first data structure for storing a database of item app
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (40)
Non-Patent Literature (3)
- "Microsoft Dynamics GP Project Management/Project Accounting," Microsoft Corporation, 2005, 4 pages.
- Collins, Jair, "Selecting the Right Supply Chain for a Customer in Project Business," An Action Research Study in the Mobile Communications Infrastructure Industry; Jan. 8, 2003; Helsinki University of Technology, 251 pages.
- Rodrigues, A. G. and Williams, T.M. Systems Dynamics in Project Management: Assessing the Impacts of Client Behavior on Project Performance. The Journal of the Operational Research Society, vol. 49, No. 1, pp. 2-15. Palgrave Macmillan Journals, accessed Nov. 20, 2010. (Year: 1998).