Patents
US 10,024,136 B2#70060817 Most CitedActiveUnited States (USPTO)Utility

Systems and methods for fluid communication with an earth formation through cement

0Forward Citations (#70060817 Global)
0.0/yrCitation Velocity (#70060817 Global)
0.56Citation PageRank (#70060817 Global)
8Prior Art Cited
2Claims (2 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A well system can include a well tool with a retarder chemical. The retarder chemical is released from the well tool into an annulus and retards setting of cement therein. A method of retarding setting of cement at a location in an annulus can include releasing a retarder chemical from a well tool connected in a casing string, after the cement is placed in the annulus. A well tool can include a valve that controls fluid communication via a port between an exterior of the tool and a flow passage extending through the tool, an annular recess, and a dispersible annular exterior component received in the recess. Another well tool can include a valve that controls fluid communication between an exterior of the tool and a flow passage extending through the well tool, an internal chamber, and a retarder chemical in the chamber.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 0.

Claims (2 — 2 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A well system, comprising: a well tool including a piston, an internal chamber, and casing connectors at opposite ends of the well tool; and a retarder chemical in the internal chamber, wherein the retarder chemical is discharged from the internal chamber into an annulus surrounding the well tool in response to a decrease in a volume of the internal chamber due to displacement of the piston, and wherein the retarder chemical retards setting of a cement in the annulus.

  2. Claim 2Independent Claim

    A well system, comprising: a well tool including a longitudinal flow passage, an internal chamber formed between the flow passage and an exterior of the well tool, and casing connectors at opposite ends of the well tool; and a retarder chemical, wherein the retarder chemical is released from the internal chamber into an annulus surrounding the well tool in

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (3)

  • Halliburton Energy Services, Inc.; "Retarders", catalog listing materials, dated Apr. 7, 2015, 1 page.
  • International Search Report with Written Opinion dated Aug. 18, 2016 for PCT Patent Application No. PCT/US2016/030107, 20 pages.
  • Office Action dated Oct. 15, 2015 for U.S. Appl. No. 14/705,688, 14 pages.