Concrete sleeper replacement method, involves sucking ballast into rail mounted wagon and using rail mounted excavator to introduce new sleepers
Abstract
Individual sleepers or groups of sleepers are replaced by sucking up the ballast around the sleepers, pulling out the old sleepers and putting in the new sleepers which are kept raised while they are secured to the rails. The ballast is sucked up into a rail-mounted wagon (16) and can later be discharged from the wagon to be used as ballast for the new sleepers. A rail-mounted excavator (22) with a grip device is used to introduce the new sleepers beneath the rails.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (0)
No backward patent references recorded.