Concrete basin constructing method for swimming pool, involves arranging inner covering on inner side of walls and bottom of basin, where covering is arranged before construction elements are transported to construction site
Abstract
The method involves manufacturing U-shaped concrete construction elements (2) that are transported to the construction site for a swimming pool basin (1). The construction elements are joined together to form the basin, where an inner covering (13) is arranged on an inner side of walls and bottom of the basin. The inner covering is arranged before the construction elements are transported to the construction site for the basin. The construction elements are mutually connected by self-locking dowels, and have a floor part and two side wall parts.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (0)
No backward patent references recorded.