The method of consolidating the slipping slope and the gradient made of grounddrilled piles
Abstract
The invention relates to construction field and is destined to consolidate the slipping slope and the gradient as well as for dangerous and flooded areas. The method proposes to forate wells in the dangerous area at the depth which is lower than the level of the slipping surface 3-4 diameters of a well. And then the lower part of the well is filled with material of low compressebility at the height of 1-2 diametres in the well, and the remained part is filled with soil and the well is forated with the dimensions of 0,6-0,8 from its initial diametre till to the level of the light compressibility material. After that the well is filled with coated soil at the height of 1,0-1,5 diametre of the well, and each coat is pressed well. Sandy soil is used as a material to be filled in. With a low humidity.Figure: 5
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 4.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.
Non-Patent Literature (2)
- SU 718541, E 02 D 3 /046, 1978 (prototip).
- Л.К. Гинзбург “Противооползневые удерживающие конструкции”, М , Стройиздат, 1970, р.80