Patents
JP S581202 A#35669920 Most CitedExpiredJapan (JPO)Utility

Controller

2Forward Citations (#35669920 Global)
0.1/yrCitation Velocity (#53510982 Global)
1.28Citation PageRank (#29342420 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

PURPOSE:To reduce the power consumption more at power failure for a controller inporporated in a processor, by increasing the period of an interruption time at power failure and its waiting time. CONSTITUTION:The system in provided with a power failure clock CL2 and a clock switching circuit 9. When a power failure is detected with a power failure detecting circuit 5, a detection signal DE is given to a clock switching circuit 9, which switches the clock of a clock generating circuit 1 from CL1 to CL2. The period of the clock CL2 is taken longer than the period of the clock CL1, resulting that the WAIT state of a microprocessor is ketp longer, allowing to reduce the power consumption. Further, the signal DE is given to the microprocessor 2 via an I/O device 4, allowing the processor 2 to reduce the power consumption more with the power failure processing which has shorter processing time than the normal processing.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 2.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (0)

No backward patent references recorded.