Power generation plant building and method of carrying heavy weight into the building
Abstract
PROBLEM TO BE SOLVED: To make strength even by setting poles supporting a building at equal intervals, and concurrently, improve the work of carrying a heavy weight into the building. SOLUTION: A power generation plant building is divided into a high building part 1a and a low building part 1b, turbine foundation stands 9 on which power train parts 7 are rested, are set in a plurality of parallel lines in shape in the cross sectional direction of the high building part 1a, and concurrently, a crane 14 is set in the high building part 1a. Besides, in a method of carrying a heavy weight into the power generation plant building, when a power train is carried into the high building part 1a, a heavy weight is raised up to the height of the turbine foundation stand by a jack-up device 17 set at the carrying in and out passage 13 of the aforesaid high building part 1a, after a power train part 7 is jacked up, the heavy weight is thereby carried to a turbine foundation stand 9 by means of a lifting jack-up device 18.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 3.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.