Handling system
Abstract
PROBLEM TO BE SOLVED: To provide a handling system which can be efficiently operated by shortening the stopping time of a loader-unloader unit, and constructed with a low investment cost, and is also easily conformable to the measurement of IC with short test time by the recombination of the handling system. SOLUTION: The frames of a loader-unloader unit 1 and a test unit 2 are mutually separated, and a carrier carrying unit 4 for carrying a carrier 3 between the loader-unloader unit 1 and the test unit 2 is provided on the test unit 2. Even when a plurality of the test units 2 are arranged to the loader- unloader unit 1, the carrier 3 can be distributed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 5.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.