Patents
JP 3,676,022 B2#14296015 Most CitedExpiredJapan (JPO)Utility

複合発電設備

7Forward Citations (#14296015 Global)
0.3/yrCitation Velocity (#22610191 Global)
2.80Citation PageRank (#8454009 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

PROBLEM TO BE SOLVED: To perform the warming-up of a composite generation system satisfactorily when the system is started. SOLUTION: A gas turbine 106 is rotated by the gas produced by a gasifier 106 to perform gas turbine generation, while a vapor turbine 109 is rotated by the steams produced by the gasifier 101 and a waste heat recovery boiler 107 to generate electricity. When the system is started, high-temperature water is fed into the gasifier 101 by means of a high-pressure pump 113, while the boiler water is returned to a condenser 11 through a water system start-up circulation line 121 to warm up the water system. The gas from the gasifier 101 is circulated through a deduster 104, a desulfurizer 105, a warming-up gas circulation line 133 and a warming-up gas compressor 134 to warm up the gas system.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 7.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (0)

No backward patent references recorded.