Production system and production method
Abstract
To ensure the production of a production system even if there is a sign of a malfunction of one of manufacturing machines and a component cannot be replaced before the malfunction.SOLUTION: When a sign of malfunctioning of a first manufacturing machine composing a production system is detected, a stop period for which an operation of the first manufacturing machine is stopped due to the malfunction is estimated and specifies a maintenance period after which the first manufacturing machine stopping the operation due to the malfunction can be brought back to a normal condition. When first and second manufacturing devices are being operated, a sign of a malfunction is detected so as to achieve a first total production rate planed by a planning unit. If the stop period of the first manufacturing machine is before the maintenance period, an amount of operation of at least the first manufacturing machine is controlled to be equal to or larger than an amount of operation performed up to the detection of the sign of the malfunction, and the total production rate up to the stop period is made equal to a second total production rate higher than the first total production rate.SELECTED DRAWIN
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 4.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗