Patents
JP 2005293527 A#6148511 Most CitedExpiredJapan (JPO)Utility

Construction cost management system

15Forward Citations (#6148511 Global)
0.7/yrCitation Velocity (#10591394 Global)
3.53Citation PageRank (#5834134 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

<P>PROBLEM TO BE SOLVED: To propose a construction cost management system capable of calculating costs at respective stages of a planed process for a construction project, and assisting designer's decisions at the stages from the viewpoint of costs. <P>SOLUTION: The construction cost management system comprises a unit price DB which stores therein composite unit price data; a conclusive cost calculating means which extracts composite unit price data from this unit price DB, and calculates a conclusive cost of a planned project based on this and quantity data readable from drawings for the planned project; an actual result DB which stores therein building summary data, past result money amount data and past result quantity data about a past building in a mutually-associated manner; and predicted cost calculating means which extracts, based on the building summary data, the past result money amount data and past result quantity data about a building corresponding to the planned project from the actual DB, calculates an analogical cost of the planned project for items of which the quantity is unreadable from the drawings based on this past result money amount data and

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 15.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 15 total)

PatentTitleYearCitations
CN 114,595,669 BCalculation table identification method and system, electronic equipment and storage medium20220
JP 7,121,891 B2構造情報表示装置、構造設計支援装置、及び構造設計支援モデル学習装置20220
CN 114,595,669 ACalculation table identification method and system, electronic equipment and storage medium—0
CN 112,669,082 AEngineering cost analysis method and system for reducing repeated workload—0
CN 116,911,581 BIntelligent production management system and method for assembled building20230
CN 116,911,581 AIntelligent production management system and method for assembled building—0
JP 2007172099 AReinforcement design support device and reinforcement design support program—4
CN 114,529,197 AData management method, system, terminal and storage medium for engineering cost—3
JP 2010191581 AProject supporting method, execution program therefor, and execution device therefor—1
CN 111,353,189 AConfiguration method and device of home decoration line material and electronic equipment—0
JP 2017117382 ABuilding structure design method, building structure design support program and building structure design and construction method—3
CN 109,325,665 AA kind of project cost appraisal procedure and system—5
JP 2019117603 AStructure information display and structure design support device and structure design support model learning device—25
CN 112,669,082 BConstruction cost analysis method and system for reducing repeated workload20230
WO 2010/095323 A1Project supporting method, execution program therefor, and execution device therefor—1

References Cited — Backward Prior Art (0)

No backward patent references recorded.