Spent fuel storage installation
Abstract
<P>PROBLEM TO BE SOLVED: To adopt an operation floor having structure for arranging storage pipes with zig-zag arrangement at high density to realize highly dense storage for spent fuel. <P>SOLUTION: Structure constituted mainly of a substantially honey-comb-shaped steel hollow structure 21, and filled with concrete 22 in it hollow part is adopted as the structure of the operation floor. The steel hollow structure comprises steel pipes 23 positioned in a just upper side of the zig-zag-arranged respective storage pipes to serve respectively as charge ports, an upper steel plate 24 and a lower steel plate 25 arranged in positions in an upper face and a lower face of the operation floor, and rib steel plates 26 for connecting the steel pipes and for connecting the upper steel plate and lower steel plate. The steel hollow structure is integrated structurally with the concrete filled in the hollow part to form the whole into a steel shell concrete structure. <P>COPYRIGHT: (C)2005,JPO&NCIPI
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 4.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.