Iron-box replacement construction method of sluice valve for water work and its device
Abstract
PROBLEM TO BE SOLVED: To provide a construction method in which an old iron box can be replaced with new one in a short time. SOLUTION: Asphalt 6, a subbase course 7 and a ground 8 (soil) in the periphery of the old iron box 5 are cut in a ring shape by a cylindrical body 94 for cutting and formed in a ring-shaped ditch 110. Asphalt 6, a subbase course material and soil and sand and the old iron box 5 in the ring-shaped ditch 110 are taken out and a pit 111 is formed. In the construction method, the new iron box is introduced into the pit 111, a section between the new iron box 5 and the pit 111 is filled with shrinkage compensating mortar 113 and shrinkage compensating mortar is back-filled, and the old iron box 5 is replaced with new one 5 by conducting finishing works by surface asphalt 114 lastly.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (0)
No backward patent references recorded.