hottub.patents
ES 106,028 U#89599649 Most CitedExpiredInternational OfficeUtility

Installation of mold to manufacture prestressed concrete beams (Machine-translation by Google Translate, not legally binding)

0Forward Citations (#89599649 Global)
0.0/yrCitation Velocity (#89599649 Global)
0.56Citation PageRank (#89599649 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

Installation of mold for factory beams of pretensed concrete characterized because it is constituted essentially by some iron bridges in a u-shape placed with a separation of approximately one meter and thirty centimeters between their axes and at a height from the ground level to the upper plane of the bridge of twenty centimeters approximately having these bridges made and also some irons welded to the sole plates of the same ones, coinciding holes through which some fastening screws pass and springs between them to prevent the transmission of the vibrations produced by a vibrator placed in the mold itself. (Machine-translation by Google Translate, not legally binding)

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (0)

No backward patent references recorded.