Alpha-chain constraints for process planning
Abstract
A method is provided that includes receiving process-related information describing a process for production of a product, including a logical sequence of tasks (902) to produce respective internal products of the process. The method also includes constructing a schedule for the process based on the process-related information, with the process schedule being for execution of at least some of the tasks (902) each of which utilizes or requires inputs including temporally a last input. Construction of the process schedule includes separating each of at least some of the respective tasks (902) into a closure portion that requires availability of the last input of its task before being initiated, and a distinct precursor portion (906) capable of being initiated before the respective last input is available. The closure portions (904) of the respective tasks (902) may be temporally sequenced without intervening precursor portions (906), and the precursor portions (906) may be prepended to respective, temporally-sequenced closure portions (904).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 1.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| EP 3,477,560 A1 | Method and system for management and control | — | 14 |
References Cited — Backward Prior Art (3)
Non-Patent Literature (1)
- EPO: "Mitteilung des Europäischen Patentamts vom 1. Oktober 2007 über Geschäftsmethoden = Notice from the European Patent Office dated 1 October 2007 concerning business methods = Communiqué de l'Office européen des brevets,en date du 1er octobre 2007, concernant les méthodes dans le domaine des act