Method for operating a steam turbine power plant with fluidized bed combustion
Abstract
The method involves supplying primary air (2a), secondary air (2b) and fluidization air (20) via a separate delivery system. The primary air and/or secondary air are pre-heated before entering into a fluidized bed kettle. The fluidization air is pre-heated using air pre-heaters (11, 18), where warm necessary for heating the fluidization air is extracted from flue gas (3) in multi-stages. The air pre-heaters are operated in series with a boiler feeding water pre-heater, where one of the heaters (11) is designed as a rotary air pre-heater.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 3.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.
Non-Patent Literature (1)
- None