Shear pin connection
Abstract
The system (2) has a sleeve part fixed to a component (40) using a reinforcement, and an arbor part fixed to another component (42) using another reinforcement. A connection between the components is formed by an arbor of the arbor part. The arbor is guided in a sliding sleeve of the sleeve part. A holding element holds the sliding sleeve and is provided on the former reinforcement. The holding element is made of two different materials and formed as a rectangular profile with two parallel surfaces. The surfaces are aligned parallel to joining-sided front sides of the components. The rectangular profile has a hollow space that is filled with a high-strength material such as high-strength concrete.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (5)
| Patent | Title | Year | Citations |
|---|