Rigid coupling of sleepers
Abstract
The method involves making multiple pre-stressed concrete sleepers (12, 14) in a long clamping bed and interspersing the concrete sleepers by clamping steel wires (20-30) clamped in the clamping bed. The steel wires are anchored at front surface with full or desired pre-stressing force on anchor plate elements (16, 18) running along a front surface of the concrete sleepers. The anchor plate elements are pre-stressed by pre-stressing steel with a smooth surface running in a longitudinal direction of the sleeper, with the same pre-stressing force as the sleeper. An independent claim is also included for a connection between two pre-stressed concrete sleepers, and/or sections of pre-stressed concrete sleepers in particular pre-stressed concrete switch-point sleepers.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 5.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗