Patents
EP 1,069,245 A1#13020182 Most CitedPendingEuropean Patent Office (EPO)Application

Process of improving ground by means of lime columns

8Forward Citations (#13020182 Global)
0.3/yrCitation Velocity (#24846655 Global)
2.09Citation PageRank (#13497706 Global)
5Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

The method involves supplying a dry binder through a sink pipe (11) sunk into the ground. The sink pipe has a cylindrical cladding pipe (12), an inner pipe (13) and a flap (17) at its lower end. The sink pipe is driven vertically into the ground to a predetermined depth, with the flap closed. The inside of the cladding pipe is supplied with dry binder, and at the same time air is drawn from the lower end of the pipe up through the inner pipe. After the cladding pipe has been filled to a partial height with dry binder, the sink pipe is drawn from the ground with the flap open, while further binder is supplied, so that a column of dry binder is left in the ground. An Independent claim is included for a device for implementing the method.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 8.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (3)

  • PATENT ABSTRACTS OF JAPAN vol. 013, no. 090 (M - 803) 2 March 1989 (1989-03-02)
  • PATENT ABSTRACTS OF JAPAN vol. 1996, no. 02 29 February 1996 (1996-02-29)
  • PATENT ABSTRACTS OF JAPAN vol. 1997, no. 03 31 March 1997 (1997-03-31)