Patents
EP 0,978,629 A2#61774053 Most CitedPendingEuropean Patent Office (EPO)Application

Method of completing a well

1Forward Citations (#61774053 Global)
0.0/yrCitation Velocity (#56833953 Global)
0.74Citation PageRank (#61774053 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

A method of completing a well comprising the steps of: extending a wellbore (16) through a subterranean zone (Z N ): positioning a perforable tubular member (18) in the wellbore (16) within the subterranean zone (Z N ); moving a tubular workstring structure (28) through the wellbore (16) in a manner positioning a predetermined longitudinal portion of the workstring structure (28) within the tubular member (18), the predetermined longitudinal portion being disposed between first and second axial sections of the workstring structure (28); axially anchoring the first and second axial sections of the workstring structure (28) relative to the wellbore (16) in a manner holding the longitudinal portion of the workstring structure (28) within the tubular member (18); creating, subsequent to the axially anchoring step, a flow passage extending between the interior of the longitudinal workstring structure portion and the interior of the subterranean zone (Z N ), the flow passage being defined in part by (1) a spaced series of first perforations disposed in the longitudinal workstring structure portion, and (2) a spaced series of second perforations aligned with the first perforations and ext

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 1.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (0)

No backward patent references recorded.