Method and device for laying pipes in the ground
Abstract
After the pipe has been laid in the base of the trench, supported by lining plates (3), the space between the longitudinal wall of the trench and the outside wall of the pipe section is back-filled with flowable material while the lining plates are removed. The material is fed through an upper opening (5) to at least one channel (4) in the lining plate and flows out along the The material is fed through an upper opening (5) to at least one channel (4) in the lining plate and flows out along the lower longitudinal edge (6) of the lining plate. A claim is also made for the lining plate having the channel for filling material.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 5.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.
Non-Patent Literature (1)
- None