Method and apparatus for the introduction of a filler material under a road or track surface
Abstract
The mixed materials are delivered or injected on site via openings in the track (6). After most of the filler material has precipitated, the liberated carrier material is allowed to drain off either through further openings in the track (12), or at the sides between the track and the foundation (3). The filling openings can be formed when initially laying the track, typically consisting of vertical round or polygonal passages lined with plastic or metal tubes, or they can be drilled at the time of insertion.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 5.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗