Method for testing low permeability formations
Abstract
An improved formation testing method for measuring initial sandface pressure and formation permeability in tight zone formations exhibiting formation permeabilities on the order of 1.0-0.001 millidarcies is based on pressure transients which occur shortly after a tester enters its pressure build-up cycle and substantially before reaching final build-up pressure. The method makes an estimate of formation permeability based on fluid decompression transients which occur in the formation tester flowlines, shortly after the tester begins its build-up cycle. The method further estimates initial sandface pressure based on the change in pressure over time shortly after beginning the build-up phase. Accurate estimates of formation permeability and initial sandface pressure are thus made relatively early in the build-up cycle, thus substantially reducing the time required to make the pressure and permeability measurements.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 37.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 37 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.
Non-Patent Literature (1)
- None