Adaptive job scheduling for multiprocessing systems
Abstract
In a master/slave multiprocessor system, process execution tasks are allocated on the basis of anticipated execution time. Work which can be performed by either the master or the slave is entered on a double ended queue (212) in a non -descending order of anticipated execution times. Processes having high anticipated execution times are selected for execution by the slave processor and processes having low anticipated execution times are selected for execution by the master processor. Anticipated holding times are computed on the basis of the time spent by the slave computer in the execution of a segment of a process without requiring interaction with the master processor. The slave processor records the time spent in execution each time a segment of the process is completed and the process has to be returned to the master. The master uses the recorded time as a measure of the anticipated execution time for a next segment of the same process.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 7.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (7 of 7 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.
Non-Patent Literature (3)
- PROCEEDINGS A.F.I.P.S. NATIONAL COMPUTER CONFERENCE 19 May 1975, ANAHEIM US pages 343 - 350; J.C. STRAUSS: 'Dynamic dispatching in job class scheduled systems.'
- PROCEEDINGS FIRST INTERNATIONAL CONFERENCE ON SUPERCOMPUTING SYSTEMS December 1985, ST. PETERSBURG US pages 195 - 202; K. VENKATASUBRAMANIAM: 'A monitor for dynamic multicomputer system.'
- R.W. WATSON 'Timesharing system design concepts.' 1970 , MCGRAW-HILL BOOK CO. , NEW YORK US