Process for the aerial transportation of prefabricated buildings
Abstract
This process relates to the construction of buildings (1) lying on foundations formed by at least one pit (2). The building (1) is transported hung beneath an aerostat (5) and is laid by the aerostat (5) over the pit (2) previously constructed and filled with a volume of water (15) corresponding to the weight of the building (1). The water (15) is withdrawn from the pit (2) and loaded into or beneath the aerostat (in 19) in order to form the return load of this aerostat (5). <IMAGE>
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 18.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗