Patents
EP 0,272,850 A2#24583679 Most CitedPendingEuropean Patent Office (EPO)Application

Apparatus for racking and handling drilling tubulars between a horizontal and a vertical position

4Forward Citations (#24583679 Global)
0.1/yrCitation Velocity (#43686125 Global)
1.41Citation PageRank (#25302108 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

A drill rig installation has, for handling the elongate tubular well elements (22,24), a handling boom (30) provided with grabs (36) to lift the tubulars from the strongbacks (20) and present them at the drilling axis (D). For this purpose the boom (30) has pivot mountings (32,38) for movements about a vertical axis and a horizontal axis respectively, and the grabs (36) are displaceable transversely from the boom. A support pad (170) for the tubular elements is transversely displaceable on the boom jointly with the grabs. The installation further comprises a grid­form base (2) providing a fixed platform on which a drilling derrick (8) can be slid to different grid positions to drill a series of bore holes. The base grid also carries the store of tubular elements (22,24) and trolleys (90) that register the elements with the handling boom (30), and other ancillary equipment such as slips and torque wrench machines (110,116) for assembling and dismantling drill strings.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 4.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (0)

No backward patent references recorded.