Method for loading vehicles on railway wagons
Abstract
1. Process for the loading of vehicles onto railway wagons, the latter being moved by means of a shifting wagon (25, 27) from a branch track (5, 7, 9) onto a track section (19, 21) of a platform (13), which is displaceable transversely to the branch track, being loaded there with vehicles via a ramp (29, 31, 33) and, after displacement of the platform, being moved off onto another branch track, characterized by the following features : 1) Three branch tracks (5, 7, 9) are provided which have the same mutual distance in the region of connection to the platform (13). 2) Empty railway wagons are available on the two outer branch tracks (5, 9). 3) The platform (13) comprises two track sections (19, 21), arranged at the distance of the branch tracks, and two shifting wagons (25, 27). 4) The ramp (29) adjoins the platform (13) opposite the central branch track (7). 5a) The roll-on and roll-off and the loading of the railway wagons is effected in such a way that, depending on the momentary position of the platform (13), an empty railway wagon is moved onto the platform (13) either from the left or the right outer branch track (5 or 9) in a zip-type system and, at the same time, the railwa
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 2.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| WO 2012/021448 A3 | Train yard classification system | — | 0 |
| US 8,302,535 B2 | Train yard classification system | 2012 | 1 |
References Cited — Backward Prior Art (0)
No backward patent references recorded.